The challenge was not simply storing enough diesel for this project. They needed a solution that could be transported legally and safely on public roads between sites. As well as perform reliably in a remote marine environment and reduce the need for fuel deliveries while the crane was working.
Calliope is Heron Construction’s barge used for dredging and marine works and has a particularly demanding fuel requirement. Having worked with Fuelchief on similar requirements before, Heron knew where to turn.
For Heron, this wasn’t just about storing fuel for ease, it was the ability to remove a fuel-supply constraint from a project and deliver to strict completion dates.
Fuelchief met the requirement with a 27TCGCAB TransCube, which enabled Heron to:
Civil and construction projects do not always happen somewhere convenient.
Equipment moves. Sites change. Fuel deliveries may be difficult to coordinate. But the machinery still needs to keep working.
Heron Construction’s solution shows what onsite fuel can provide when the work is remote: compliant storage, fuel where it is needed and less dependence on off-site refuelling.
This means greater control over an essential part of keeping the project moving.
Tell us what your site needs. We’ll help you work through the right fuel solution and get it operating.